EMERGENCY ORDER REGARDING SUMP PUMPS IN EFFECT

MUNICIPALITY OF ROBLIN
EMERGENCY ORDER

WHEREAS the Municipality of Roblin declared a State of Local Emergency on June 9, 2026, in response to flooding, excessive groundwater, infrastructure impacts, and related threats to persons and property within the Municipality;
AND WHEREAS
the State of Local Emergency remains in effect pursuant to an extension authorized by the Minister;
AND WHEREAS the Municipality's sanitary sewer system and sewage lift stations are experiencing elevated inflow and operating demands as a result of the emergency;
AND WHEREAS the discharge of water from sump pumps, foundation drainage systems, weeping tiles, or similar equipment into the Municipal Sanitary Sewer System places additional and unnecessary demands on the system and may contribute to sewer backups, infrastructure failure, property damage, and risks to public health and safety;
AND WHEREAS
subsection 12(1) of The Emergency Measures Act authorizes a local authority, during a State of Local Emergency, to issue an order requiring any person to do everything necessary to prevent or limit loss of life and damage to property or the environment;

NOW THEREFORE, PURSUANT TO SUBSECTION 12(1) OF THE EMERGENCY MEASURES ACT, IT IS HEREBY ORDERED THAT:

  1. Effective immediately, no owner, occupant or person responsible for a property within the urban community of Roblin shall permit a sump pump to discharge, either directly or indirectly, into the Municipal Sanitary Sewer System.
  2. Every owner, occupant or person responsible for a property having a sump pump connected to or discharging into the Municipal Sanitary Sewer System shall immediately disconnect the sump pump from the Municipal Sanitary Sewer System and redirect its discharge to a location where the discharged water cannot enter, flow into, drain into, or otherwise be returned to the Municipal Sanitary Sewer System, whether directly or indirectly.
  3. The Designated Officer and any other person authorized by the Chief Administrative Officer are authorized to:

(a)  communicate and administer this Order;

(b)  investigate suspected non-compliance;

(c)  provide directions reasonably necessary to obtain compliance; and

(d)  take all reasonable steps necessary to enforce this Order and exercise any action, power or remedy available to the Municipality under The Emergency Measures Act, any other applicable enactment, or any Municipal By-law.

  1. This Order applies notwithstanding any prior permission, arrangement, or practice that may have permitted a sump pump to discharge into the Municipal Sanitary Sewer System.
  2. This Order remains in effect until it is rescinded by Council or until the State of Local Emergency affecting the Municipality is terminated or expires, whichever occurs first.
  3. Notice of this Order shall be communicated by any appropriate means, including publication on the Municipality's website, social media accounts, and emergency notification system.

 

DATED at Roblin, Manitoba, this 17TH day of JULY, 2026.

BY RESOLUTION NO. 2026-285 OF THE COUNCIL OF THE MUNICIPALITY OF ROBLIN

WATER RESTRICTIONS REMAIN REMAIN IN EFFECT

The Municipality is once again falling behind at the lift stations. Although conditions may appear normal at the surface, they are not; significant groundwater continues to enter the sanitary sewer system and is placing extreme pressure on municipal infrastructure.

Residents are asked to reduce water use wherever reasonably possible, including laundry, long showers, dishwashing, and other non-essential water use. We understand that conserving water is challenging, but every reduction helps prevent sewer backups and system failures.

Sump pumps and groundwater must not discharge into the sanitary sewer system. If your sump pump is connected to the sewer, disconnect and redirect it immediately to a location where the water cannot flow back into the sanitary sewer system.

Free sump-pump discharge hose is available at the Municipal Office. If you need hose, please ask. If you need assistance determining how to properly reroute your sump pump, please contact the Municipal Office.

The Municipality of Roblin is asking residents to report any flood-related damage to private property resulting from the recent flooding event.

To report flood-related damage, submit an online form available at: www.roblin.ca/2026flood or by contacting the Municipal Office by telephone at (204) 937-8333.

Building & Development Permit Guidelines

What is the difference between Building Permits & Development Permits?

  • Development Permits are required for minor projects such as windows, siding, fences and minor interior renovations under a $5,000.00 value. They are also required for farm accessory buildings such as sheds and shops under 6400 square feet, as well as grain bins, grain dryers etc.
  • Building Permits are required for bigger projects such as houses, garages, decks, commercial buildings, residential projects and major interior renovations over $5,000.00 value.

 

Why is a Building or Development Permit Required?

These permits are documents which grant permission to begin construction of a building project.  They are required in order to protect the health, safety and welfare of the public by providing the means for the Municipality of Roblin to ensure the necessary officials review the project design and inspect the construction for minimum standards as required by the Manitoba Codes, as well as ensure the projects meet Zoning and Development By-Law requirements.  Failure to receive an approved Permit could result in the Owner's costs for By-Law infractions, non-code compliance, Engineer inspections, Orders of Remediation/Removal and Legal action by the Municipality.

 

What Information is Required when Applying for a Permit?
  • Land title information or proof of ownership.
  • Description of the project including proposed use and size to determine if it meets Zoning requirements or if a Conditional Use is required.
  • Site plan which indicates where on the property the structure is going including distances in feet to all property lines, to determine if a Variance is required.
  • Other Information that may be required, depending upon the project:
    • Survey certificate may need to be provided if the location of property lines are unsure or disputed,
    • Manitoba Engineer's Designed and Stamped Plans,
    • Electrical and Plumbing Drawings,
    • Deck and Step Plans,
    • Lot grading and Drainage Plans; and
    • General Contractor and Sub-Contractor list.

Check with the Planning Department to determine what the requirements are for your project.

 

NOTE The Municipality has a number of different Zones as per the Zoning By-Law so it's important to check your Zoning to ensure your development meets all Zoning Requirements in regards to allowable and conditional uses as well as setback requirements.  

 

Applications