Flood Recovery Support Coming to the Parkland Region

Need Help with Flood Recovery?

Manitoba Transportation and Infrastructure's Emergency Management Organization (EMO), in partnership with the Canadian Red Cross, is providing in-person recovery support and services for residents affected by recent flooding.

Residents are invited to attend a Recovery Support Community Hub in Dauphin, Russell, or Roblin. These locations will serve residents from surrounding communities and municipalities. Virtual support is also available for those unable to attend in person.

Recovery specialists can help residents:
- Understand insurance.
- Complete financial assistance applications.
- Access information on recovery programs, services, and eligibility requirements.

Recovery Support Community Hubs:
The following locations will serve as Recovery Support Community Hubs for residents across the Parkland Region. Residents are encouraged to attend the location most convenient for them.

Location                                                                  Date                                         Time
Community Centre, 55 6 Ave NE, Roblin, MB         Thursday, August 13, 2026       9:00 a.m. - 7:00 p.m.

Can't Attend in Person?
Virtual recovery support is available through the Canadian Red Cross. Recovery specialists can assist residents by phone or through Teams or Zoom. They can help complete applications, explain required supporting documentation, and provide guidance on submitting applications and additional information. To book a virtual appointment, contact the Canadian Red Cross:

Email: MB26Recovery@redcross.ca
Phone: 1-800-863-6582 (leave a message)

Questions?
Visit your municipal office, attend one of the Recovery Support Community Hub sessions, book a virtual appointment or contact the:

Manitoba Flood Recovery Program
Phone: 204-945-3050
Toll-Free: 1-888-267-8298
Email: mfrp@gov.mb.ca
Website: www.gov.mb.ca/mfrp

For the latest information and program updates, visit: www.gov.mb.ca/mfrp

WATER RESTRICTIONS REMAIN REMAIN IN EFFECT

The Municipality is once again falling behind at the lift stations. Although conditions may appear normal at the surface, they are not; significant groundwater continues to enter the sanitary sewer system and is placing extreme pressure on municipal infrastructure.

Residents are asked to reduce water use wherever reasonably possible, including laundry, long showers, dishwashing, and other non-essential water use. We understand that conserving water is challenging, but every reduction helps prevent sewer backups and system failures.

Sump pumps and groundwater must not discharge into the sanitary sewer system. If your sump pump is connected to the sewer, disconnect and redirect it immediately to a location where the water cannot flow back into the sanitary sewer system.

Free sump-pump discharge hose is available at the Municipal Office. If you need hose, please ask. If you need assistance determining how to properly reroute your sump pump, please contact the Municipal Office.

The Municipality of Roblin is asking residents to report any flood-related damage to private property resulting from the recent flooding event.

To report flood-related damage, submit an online form available at: www.roblin.ca/2026flood or by contacting the Municipal Office by telephone at (204) 937-8333.

Building & Development Permit Guidelines

What is the difference between Building Permits & Development Permits?

  • Development Permits are required for minor projects such as windows, siding, fences and minor interior renovations under a $5,000.00 value. They are also required for farm accessory buildings such as sheds and shops under 6400 square feet, as well as grain bins, grain dryers etc.
  • Building Permits are required for bigger projects such as houses, garages, decks, commercial buildings, residential projects and major interior renovations over $5,000.00 value.

 

Why is a Building or Development Permit Required?

These permits are documents which grant permission to begin construction of a building project.  They are required in order to protect the health, safety and welfare of the public by providing the means for the Municipality of Roblin to ensure the necessary officials review the project design and inspect the construction for minimum standards as required by the Manitoba Codes, as well as ensure the projects meet Zoning and Development By-Law requirements.  Failure to receive an approved Permit could result in the Owner's costs for By-Law infractions, non-code compliance, Engineer inspections, Orders of Remediation/Removal and Legal action by the Municipality.

 

What Information is Required when Applying for a Permit?
  • Land title information or proof of ownership.
  • Description of the project including proposed use and size to determine if it meets Zoning requirements or if a Conditional Use is required.
  • Site plan which indicates where on the property the structure is going including distances in feet to all property lines, to determine if a Variance is required.
  • Other Information that may be required, depending upon the project:
    • Survey certificate may need to be provided if the location of property lines are unsure or disputed,
    • Manitoba Engineer's Designed and Stamped Plans,
    • Electrical and Plumbing Drawings,
    • Deck and Step Plans,
    • Lot grading and Drainage Plans; and
    • General Contractor and Sub-Contractor list.

Check with the Planning Department to determine what the requirements are for your project.

 

NOTE The Municipality has a number of different Zones as per the Zoning By-Law so it's important to check your Zoning to ensure your development meets all Zoning Requirements in regards to allowable and conditional uses as well as setback requirements.  

 

Applications